A storage tank in the valley faces the same wear as anywhere, with summer heat adding to the pressure side of the ledger.
The parts
Relief valve — opens at its stamped pressure, then weeps or seizes. Afternoon lifting through summer is a pattern, not a coincidence.
Anode — spent so the steel is not; its remaining thickness is the protection left.
Top fittings — corrode and track water down the jacket.
Expansion tank — a failed bladder leaves expansion with nowhere to go, which is when the valve starts lifting.
Heating side — thermostats and elements, or the gas side's thermocouple, igniter and valve.
Pressure
A regulator closes the system. Expansion control is the answer; a new valve alone will lift again by the next hot week.
Heat
High inlet temperature and a warm utility space both raise what the vessel is asked to withstand. Where the unit sits is part of the diagnosis.
The decision
A part on a sound tank. Through the steel, it is finished.
No count is quoted for this place while its ZIP remains unresolved.